× Welcome to the CMASS forum!

A place to discuss anything related to CMASS (and other) launches.

Winter Project - Two Stage AP

More
13 years 4 months ago #4832 by hgreenblatt
Replied by hgreenblatt on topic Re:Winter Project - Two Stage AP
I am going to keep the Raven in the upper part of the sustainer and definitely configure it for dual deploy. I am planning on having a plug like disconnect for the igniter wire between the booster and upper section of the sustainer which will come appart at apogee. I\'ll run the igniter wire down a small tube on the outside (maybe the inside if I can figure out how to do it) of the lower section of the sustainer. I will take a few pictures and post them as I get further along.

Please Log in or Create an account to join the conversation.